Customer turns to PSI after ongoing issue with pitch drive failures
| Overview: | A wind farm approached PSI to analyze an ongoing issue with pitch drive failures. |
| Root Cause: | PSI Engineering Services performed failure analysis and discovered that the failures were due to a failed IC. |
| Solution: | PSI Engineering Services upgraded the OEM design by installing an IC that limited the IC input voltage, which eliminated the failures. |
| Results: | By upgrading the OEM design, PSI saved the wind farm over $165,000 in one year. |